Karapiro Boathouse Porotherm Project
“We put a thermometer in our new relocatable timber house and another one upstairs in the boathouse. Even though the boathouse is not finished or closed in properly yet, it was 30 degrees in the relocatable and 19 degrees inside the boathouse with the Porotherm walls! We are thrilled.”
Joanne Leigh, Karapiro, 2019
Joanne Leigh, Karapiro, 2019
Read more testimonial

The team of block layers, builders and sub contractorshave been fantastic, consulting with Jon andI, plus Chris on a regular basis to ensure that the build goes smoothly and all practical aspects are considered. Small changes have been made along the way, with Adrian (main blocklayer, plasterer and tiler) doing a great job of bringing all the sub contractors up to speed on how to work best with the blocks. We look forward to finishing this project hopefully before Christmas, so that the boat can enjoy being undercover and our friends and family can enjoy staying in the upstairs portion of the boatshed”
Joanne Leigh, Karapiro, 2018